Overview
Commercial construction in Multan is a different job from building a house. A plaza or office building has stricter approvals, heavier loads and more people using it every day, and it needs to start earning rent as soon as it can. We plan for all of that from the first meeting, so the design, the BOQ and the schedule work for your investment, not just for the drawings.
Schools and colleges are commercial work too: the NUML Multan campus, a Denning campus and a KIPS College building are among the education buildings we have delivered. If you own a commercial plot and are not sure what it can become, that is the right time to talk to us.
What you get from day one
What is included
Six parts · one contract
01
We look at the plot, its permitted use and how many floors the approvals allow, and talk through what the building should earn.
02
Architectural, structural and services drawings, and the submissions the approving authority needs.
03
Quantities, rates and payment stages written down before work starts.
04
Foundations, frame and slabs designed for commercial loads, with basement or parking levels if the plan needs them.
05
Electrical and plumbing work, shop fronts, stairs and common areas, finished to the schedule you approve.
06
Final walk-through, snag list, and all drawings and documents handed over to you.
Our process
01
What do you want the building to do, and what will the plot allow? We answer that before any drawing is made.
02
Drawings are developed with you and submitted for approval. Work on site starts only once approval is in hand.
03
Every item, quantity and rate is written down, with payments tied to stages you can see completed.
04
Foundations, frame and slabs, floor by floor, with steel and concrete checked before each pour.
05
Wiring, plumbing, shop fronts and common areas, finished in the order that lets you start renting sooner.
06
A full walk-through, a snag list we close out, and every drawing and document handed to you.
Materials & quality
A commercial building sees more weight, more traffic and more wear than a home. The steel grade, concrete strength and fire safety provisions are set in the structural design and agreed with you in writing before work begins.
You can visit the site at any stage, and the weekly report shows what was built, what was checked and what comes next.
Checks on every floor
Time
It depends on the number of floors, the covered area, any basement work and how long approvals take.
You get a dated schedule before work starts. If something outside our control causes a delay, we tell you the same week and update the plan.
Cost
Every commercial building is priced on its own plan. These are the biggest factors:
Related projects
Questions
Have a question about your own plot? Call 0300-0672384 and ask.
Can you help decide how many floors to build?
Yes. We look at what the approvals allow on your plot, your budget and the rent the area supports, and talk you through the options before design starts.
Can the building be built in phases?
Some owners build the lower floors, start renting, and add floors later. If you plan to do this, the structure is designed for the final height from day one.
Who handles the approvals?
We prepare the drawings and documents the approving authority asks for, submit them and follow up until approval comes through.
I am not based in Multan. Can I still build a plaza with you?
Yes. You get weekly photo reports and stage-wise updates, and payments are linked to completed stages, so you can follow progress from anywhere.
How do I get a quote for a plaza or office building?
Send us the plot size, location and what you want to build using the form on this page, or call 0300-0672384. We visit the plot and then send a written estimate.
CEO · Ali Akbar Mahay
0300-0672384
Copy