Overview
Turnkey construction in Multan means you deal with one company from design to handover, instead of hiring an architect, a contractor, a plumber, an electrician and a dozen suppliers yourself. We manage the design, approvals, grey structure, finishing and handover under one agreement, with one BOQ and one schedule.
It suits families who are busy, who live abroad, or who simply do not want to spend months chasing labour and materials. You make the decisions that matter, like the layout, the tiles and the kitchen. We handle the rest and keep you updated every week.
What turnkey includes
What is included
Six parts · one contract
01
Architectural, structural and electrical drawings, worked out with you until the layout feels right.
02
Map approval and the paperwork that goes with it, handled before construction starts.
03
Foundations, frame, slabs and brickwork, with steel and concrete checked at every stage.
04
Floors, kitchen, bathrooms, doors, windows and paint, to the finishing schedule you approve.
05
We buy and deliver materials, so you do not have to deal with suppliers or check deliveries yourself.
06
A final walk-through, a snag list we fix, and the keys, drawings and documents.
Our process
01
We visit the plot and listen: how many rooms, how you live, what budget you have in mind.
02
Drawings go back and forth with you until the layout is right. Nothing is final until you say so.
03
The map goes for approval while you review the BOQ, finishing schedule and payment plan.
04
The frame, slabs and walls go up, with weekly photos and checks before every pour.
05
Floors, kitchen, bathrooms and paint, using the materials you picked in the finishing schedule.
06
We walk through every room with you, fix the snag list and hand over the keys.
Quality
With turnkey, nobody can blame someone else. If a tile is cracked or a tap leaks before handover, it is ours to fix. Materials are agreed by brand and grade in the finishing schedule, and you can visit the site or ask for photos at any stage.
If you change your mind about something, we show you the cost and time difference in writing first, and only go ahead once you agree.
What we check along the way
Time
From the first meeting to handover, the time depends on size, design and how long approval takes.
Design and approvals come first. After that the written schedule shows a date for each stage, and we keep it updated if anything moves.
Cost
A turnkey price covers the whole job, so these choices matter most:
Related projects
Questions
Want to talk it through? Call 0300-0672384.
What is the difference between turnkey and grey structure?
Grey structure covers the frame, slabs and walls without finishing. Turnkey covers everything, from design to a finished house you can move into.
Can I still choose my own tiles and fittings?
Yes. You pick them in the finishing schedule, either from options we suggest or from shops you prefer. We then buy and install them.
What if I want to change something halfway through?
Tell us before that stage starts. We show you the cost and time difference in writing, and only go ahead once you agree.
Is turnkey more expensive?
The total depends on the finishing you choose. What turnkey saves is your time and the cost of mistakes that happen between different contractors. The BOQ lists every line, so you can compare it fairly with other quotes.
Do you take on turnkey projects for overseas Pakistanis?
Yes. You get weekly photos and updates on WhatsApp, and we can video call from site whenever you want to see progress.
How do I get a turnkey quote?
Use the form on this page or call 0300-0672384 with your plot size and location. We visit the plot, then send a written estimate.