Houses and villas built to an approved map, a written BOQ and a schedule you can hold us to. From a 5 marla family home to a 2 kanal villa.

Overview

From soil test to keys, with one team

Planning to build a house in Multan? We take care of house construction from the first site visit to the day you move in: drawings, approvals, grey structure, finishing and handover. Before any work starts you get a written BOQ, so the price is clear room by room, and a schedule split into stages you can track.

Whether you have a small plot for a family home or a kanal or more for a villa, the process and the paperwork are the same. You see weekly photos from site, you approve changes before they are built, and you always have one person to call.

What you get from day one

  • A site visit and soil test before the design is final
  • A written BOQ with quantities and rates
  • A stage-by-stage schedule and payment plan
  • Weekly photos and notes on WhatsApp
  • Handover with keys, drawings and documents

What is included

What the service covers

Six parts · one contract

01

Site visit & soil test

We look at the plot, access, levels and soil before anything is drawn.

02

Drawings & map approval

Architectural and structural drawings, and the documents the approving authority asks for.

03

BOQ & agreement

Every item, quantity and rate written down, with payments linked to stages.

04

Grey structure

Foundations, columns, beams, slabs, brickwork, and conduits for plumbing and wiring.

05

Finishing

Plaster, flooring, tiles, doors, windows, kitchen, bathrooms and paint, to the schedule you approve.

06

Handover

A final walk-through, a snag list we fix, and the keys, drawings and warranties handed to you.

Our process

How we build your house

01

Visit & soil test

We meet you on the plot, check access and levels, and arrange a soil test so the foundation suits the ground.

02

Design & approval

Drawings are finalised with you, then submitted for map approval. Construction starts only after approval.

03

BOQ & agreement

You get the BOQ, schedule and payment plan in writing. Take your time, ask questions, then sign.

04

Grey structure

Foundations, frame, slabs and brickwork, with steel checked before every pour and weekly photos sent to you.

05

Finishing

Plaster, floors, kitchen, bathrooms and paint, using the materials and brands you approved in the schedule.

06

Handover

We walk through the house with you, fix the snag list and hand over keys, drawings and documents.

Materials & quality

Agreed in writing, checked on site

Cement, steel, bricks, tiles and fittings are agreed by brand and grade before work begins, and you can ask to see the receipts for what goes into your house.

If you want to change a material later, we show you the cost difference first and only go ahead once you agree.

Checks we do on every house

  • Steel placement and cover checked before each slab is poured
  • Concrete curing watched for the days it needs
  • Brickwork lines, levels and bonding checked as walls go up
  • Plumbing pressure-tested before plaster covers the pipes
  • Wiring tested before handover

Time

How long does it take?

It depends on the covered area, the design and how quickly the map is approved. As a rough guide, the grey structure of a 10 marla house usually takes and finishing takes another .

Before work starts you get a written schedule with each stage dated. If something outside our control causes a delay, such as weather or a material shortage, we tell you straight away and update the dates.

Cost

What affects the cost per square foot

We do not publish one rate per square foot, because it would not be honest without seeing your plot and plan. These move the number most:

  • Covered area and number of floors
  • Grey structure only, or complete with finishing
  • The quality of finishing materials you choose
  • A basement, cantilevers or double-height spaces
  • Soil condition, water table and access to the plot
  • Steel and cement prices at the time of purchase

Questions

House construction FAQs

Could not find your question? Call 0300-0672384 or send it on WhatsApp.

Can I see the BOQ before I commit?

Yes. The BOQ is prepared after the site visit and before any agreement is signed. You can take it home, compare it with other quotes and ask us about any line.

Can I choose my own finishing materials?

Yes. We agree the finishing schedule with you room by room. You can pick tiles, fittings and paint yourself, or ask us to suggest options that fit your budget.

Will you help with the map approval?

Yes. We prepare the drawings and documents the approving authority asks for and follow up until the map is approved. Construction starts only after that.

How do payments work?

Payments are linked to stages in the agreement, for example after the foundation, after each slab and at finishing milestones. You pay for work that has been done, and every payment is recorded.

I live abroad. Can you still build my house?

Yes. You get weekly photos and progress notes on WhatsApp, and we can video call from site whenever you want to see the work for yourself.

How do I get a construction quote?

Fill in the form on this page or call 0300-0672384 with your plot size and location. We arrange a site visit and then send you a written estimate.