Overview
Planning to build a house in Multan? We take care of house construction from the first site visit to the day you move in: drawings, approvals, grey structure, finishing and handover. Before any work starts you get a written BOQ, so the price is clear room by room, and a schedule split into stages you can track.
Whether you have a small plot for a family home or a kanal or more for a villa, the process and the paperwork are the same. You see weekly photos from site, you approve changes before they are built, and you always have one person to call.
What you get from day one
What is included
Six parts · one contract
01
We look at the plot, access, levels and soil before anything is drawn.
02
Architectural and structural drawings, and the documents the approving authority asks for.
03
Every item, quantity and rate written down, with payments linked to stages.
04
Foundations, columns, beams, slabs, brickwork, and conduits for plumbing and wiring.
05
Plaster, flooring, tiles, doors, windows, kitchen, bathrooms and paint, to the schedule you approve.
06
A final walk-through, a snag list we fix, and the keys, drawings and warranties handed to you.
Our process
01
We meet you on the plot, check access and levels, and arrange a soil test so the foundation suits the ground.
02
Drawings are finalised with you, then submitted for map approval. Construction starts only after approval.
03
You get the BOQ, schedule and payment plan in writing. Take your time, ask questions, then sign.
04
Foundations, frame, slabs and brickwork, with steel checked before every pour and weekly photos sent to you.
05
Plaster, floors, kitchen, bathrooms and paint, using the materials and brands you approved in the schedule.
06
We walk through the house with you, fix the snag list and hand over keys, drawings and documents.
Materials & quality
Cement, steel, bricks, tiles and fittings are agreed by brand and grade before work begins, and you can ask to see the receipts for what goes into your house.
If you want to change a material later, we show you the cost difference first and only go ahead once you agree.
Checks we do on every house
Time
It depends on the covered area, the design and how quickly the map is approved. As a rough guide, the grey structure of a 10 marla house usually takes and finishing takes another .
Before work starts you get a written schedule with each stage dated. If something outside our control causes a delay, such as weather or a material shortage, we tell you straight away and update the dates.
Cost
We do not publish one rate per square foot, because it would not be honest without seeing your plot and plan. These move the number most:
Related projects
Questions
Could not find your question? Call 0300-0672384 or send it on WhatsApp.
Can I see the BOQ before I commit?
Yes. The BOQ is prepared after the site visit and before any agreement is signed. You can take it home, compare it with other quotes and ask us about any line.
Can I choose my own finishing materials?
Yes. We agree the finishing schedule with you room by room. You can pick tiles, fittings and paint yourself, or ask us to suggest options that fit your budget.
Will you help with the map approval?
Yes. We prepare the drawings and documents the approving authority asks for and follow up until the map is approved. Construction starts only after that.
How do payments work?
Payments are linked to stages in the agreement, for example after the foundation, after each slab and at finishing milestones. You pay for work that has been done, and every payment is recorded.
I live abroad. Can you still build my house?
Yes. You get weekly photos and progress notes on WhatsApp, and we can video call from site whenever you want to see the work for yourself.
How do I get a construction quote?
Fill in the form on this page or call 0300-0672384 with your plot size and location. We arrange a site visit and then send you a written estimate.